Article: JHS Project Update-4/9/24

JHS Project Update-4/9/24

New Build

Please see the below 3wk lookahead schedule for Jefferson High School.
 
I hope you all enjoyed the beautiful weather this past weekend.
We are in the finishing stages of the project and it is really coming together.
 
Concrete polishing is complete. Trim out continues on second floor. Restroom tile is being placed in the 2nd floor restrooms. Plumbing fixtures are being set on first floor.
DAC is setting the fume hood this week and installing FRP. Next week 1st floor carpet installation begins.
We will also start welding all of our interior handrail as well as setting 2nd floor casework.
 
On the exterior, the south entry stairs and fire riser room stairs are complete. Next, we will start prepping our sidewalks beginning on the south side of the building.
 
Last Week:
 
  • 2nd floor drywall finishing (Area G)
  • 2nd floor trim out (Area G)
  • 2nd floor paint (Area G)
  • 2nd floor lighting (Area G)
  • 2nd floor fire alarm (Area G)
  • Roofing face metal & detailing (Area G)
  • 2nd floor concrete polish (Area G)
  • 1st floor plumbing fixtures (Area G)
  • 1st floor mechanical equipment room layout (Area G)
  • Site concrete backfilling (Area G)
  • South entry stairs form & pour (Area G)
This Week:
  • 2nd floor trim out (Area G)
  • Paint (Area G)
  • 2nd floor lighting (Area G)
  • Roofing face metal & detailing (Area G)
  • 2nd floor concrete polish (Area G)
  • 2nd floor restroom tile (Area G)
  • 1st floor plumbing fixtures (Area G)
  • 1st floor mechanical equipment room layout (Area G)
  • Sidewalk prep and irrigation sleeves (Area G)
  • Front entry ramp repairs (Area G)
  • Set fume hood (Area G)
  • Wall protection (Area G)
Next Week:
  • 2nd floor trim out (Area G)
  • 2nd floor lighting (Area G)
  • Roofing face metal & detailing (Area G)
  • 2nd floor casework (Area G)
  • 2nd floor restroom tile (Area G)
  • 1st floor plumbing fixtures (Area G)
  • 1st floor mechanical equipment room layout (Area G)
  • Sidewalk prep and irrigation sleeves (Area G)
  • Front entry ramp repairs (Area G)
  • 1st floor flooring begins (Area G)
  • Interior handrail (Area G)

← BACK
Print This Article
© 2024. Jefferson High School. All Rights Reserved.